Have long been engaged in metallurgy, cement, electrolytic industry and have a relatively deep knowledge about this profession.
Have long been engaged in large and medium-sized projects in the design, selection, commissioning.
Have long been engaged in Siemens and the mixed expansion of ABB equipment and have a relatively deep understanding of the equipments for direct current (6RA70, DCS500)
Have long been engaged in the design and debugging of automation and transmission equipments and have rich knowledge both in the Siemens S7 series PLC and the mainstream of the company's high-power AC-DC devices.
Be proficiency in the use of the relevant design debug software, such as OFFICE, CAD, protel, STEP7, etc.
太多了,时间关系只能翻译这段了.专业词汇不是太熟,语法是没有问题的.
二手全自动钢管穿孔机
Personal:
Has long been engaged in metallurgy, cement, electrolytic industry, such a relatively deep industry knowledge.
Has long been engaged in large and medium-sized projects in the design, selection and commissioning.
ABB and Siemens has long been engaged in the mixed expansion of equipment, equipment for direct current (6RA70, DCS500) a relatively deep understanding.
Has long been engaged in automation, transmission equipment design and debugging, the Siemens S7 series PLC and the mainstream of the company's high-power AC-DC devices are relatively deep.
Proficiency in the use of the relevant design debug software, such as OFFICE, CAD, protel, STEP7, and so on.
Performance:
The main content of the work of the project name
Iron & Steel Research Institute 0.2HZ ~ 10HZ/2500A.40V use of low-frequency power S7-200PLC, and TD200, the realization of an adjustment from 0.2HZ ~ 10HZ to adjust the frequency cycloconverter. Completed the process of writing and debugging, as well as the hardware circuit design, including trigger circuit and the circuit to improve the detection and debugging of the completed on-site work.
Jiangxi Copper electrolytic copper 4KA rectifier device using ABB's DCS500 control circuit to achieve 12-pulse control. 40KA completed the rectification device to trigger the 12-pulse control. And the commissioning of the on-site installation.
Tongling Dongguashan 2500A/690V copper mine hoist the use of ABB's DCS600 control unit at the scene of an old original company 10 years ago, ABB mine hoist 2500A of direct current transmission equipment for upgrading, and to retain its thyristor RC Absorption, such as power, control and the replacement of detection, some of the excitation control. Transformation after the end of the PLC with regard to machinery and equipment to complete a full set of debugging work.
Shenyang down Shengda 18KA, 12KA, 6KA electric arc furnace equipment. The use of analog circuit design of the rectifier control devices for the realization of titanium metal smelting electric arc furnace control device to control the completion of the pre-commissioning and commissioning on-site installation.
Cold-rolled aluminum plant in Zhengzhou in Henan Province in 2050 cold-rolled aluminum plant to use the Siemens 830V/4400A mixed module to improve the work, including the detection circuit, to improve the trigger loop. And participated in some of the live transmission of the debugging work
Rong Cheng Tianjin, Qingdao Steel 550A/380V electromagnetic stirring power inverter to participate in the completion of the design of the hardware, software debugging and on-site improvements, as well as the maintenance of the latter part of the work.
Langfang Fortune 1050 reversible single frame reversible cold-rolled sheet unit to participate in the on-site installation completed by ABB's DCS500 DC transmission control circuit and the King of the new company composed of direct current power circuit transmission equipment and SIEMENS's S7 - 400PLC constitute a set of cold-rolled unit of electrical control equipment debugging equipment.
Tianjin Jianglin 1100 plane six-high mill stand-alone module mixed trigger new board needs to improve on-site thyristor 300MA starting current, the original trigger for the board to re-design changes.
Qingzhou City, Shandong Province 273 seamless steel tube production lines at the scene of the scene as a debugging responsible for the transmission, from the completion of the installation is complete acceptance of the inspection, product testing, debugging stand-alone, automated debugging, the FBI system, the heat load trial run production, normal production, the final acceptance The entire process.
Single Bazhou in Hebei 1450 plane reversible cold rolling system, detailed design and drawings of the principle of painting, selection of components, wiring on-site arrangements.
China Metallurgical pressure Shaanxi, Zhejiang 1150 Concord reversible cold rolling system, detailed design and drawings of the principle of painting, selection of components, wiring on-site arrangements.
Northwest chicken Steel Group 120 tons of converter steel North Group, a steel plant, 2 sets of 120 tons of converter steel-making equipment, on-site commissioning
Liaocheng in Shandong Steel Alliance of seamless steel pipe joint seamless steel pipe perforated steel, pipe rolling machine, sizing machine, straightening machine on-site commissioning
Personal overview:
I graduated in 2005, has been engaged in the electrical automation industry, as companies in the XX electrical engineer so far. Mainly engaged in electric transmission as well as the automation of pre-designed products, modified, as well as on-site commissioning of the work; complete sets of equipment design, graphics, selection, as well as on-site commissioning, training of personnel to safeguard the latter part of the work. Of power electronics technology, digital-analog circuit PLC, as well as knowledge of a relatively deep. DC has long been engaged in, the frequency of exchange-related work in the field. There is an abundance of on-site debugging in the field of metallurgy-related experience, such as metallurgical plants, cold-rolled plant and smelting plant, and so on. Have good command of English listening and speaking ability, teamwork spirit, careful logic capacity. Long-term on-site work to develop the capacity to do good and careful approach to their work.
二手全自动钢管穿孔机
①中星钢管机械有限公司
②通泽重工有限公司
以上公司内容的真实性、准确性和合法性请自行甄别、本人概不负责。

即将到来的节日:5月劳动节放假5天!再忙也要对自己好点哦!
二手全自动钢管穿孔机完!
热搜弹幕:二手全自动钢管穿孔机,,